Relocation Work between Kaleköy-Yamaç Villages within the scope of YUKARI KALEKÖY Dam and HEPP Project “Earth Works and engineering structures (explosive cutting excavation, non-blasting cutting excavation, loading of the excavated material, transportation to an average of 3 km., laying it in the warehouse or creating fill, run-of-mine material). Turnkey construction of “filling with filler, laying of road superstructure with stabilized filling material, formwork (material), reinforced concrete bar, water retainer, concrete and reinforced concrete concrete workmanship of engineering structures”